Wallis Hill CWT
For over a century, Wallis Hill Clear Water Storage tank has provided potable water storage for the town of Seymour. It comprises brick walls supported by unreinforced concrete buttresses and is approximately 35.1m long, 22.2m wide and 5m deep with a nominal capacity of 4ML. We rehabilitated the tank’s concrete substrate and replaced its liner to prolong service life.
Munna Point Bridge
Built in 1979, Munna Point Bridge is a 7-span structure and high traffic connection link for tourists and locals commuting between Noosaville and Noosa Heads. We undertook repair and remediation works to extend the life of the asset by 50 years.
Cape Don Lighthouse
Built in 1917, the lighthouse consists of a reinforced concrete tower 28m high with a circular barrel, an octagonal 6m wide base and a reinforced concrete balcony. MCM were engaged to rehabilitate and repair the lighthouse’s external damage.