The project is a prime example of hybrid protection targeted to the areas in need of protection. The site team successfully met all the practical challenges as well as the stringent environmental controls

 

The Alfords Point Bridge is twin structure 445m concrete and steel box girder bridge carrying the A6 across Georges River between Padstow Heights and Alfords Point. The initial western carriageway was built in 1973 with the eastern carriageway being duplicated in 2008.

Client Brief

Ventia Boral Amey Joint Venture, on behalf of Transport for NSW (TfNSW), awarded MCM two contracts to repair and protect the pile caps and lower piers steel reinforcement from Chloride Induced Corrosion.

What we delivered (Stages 1 & 2):

  • Provision of floating and fixed access

  • Installation and commissioning of Hybrid Anode Cathodic Protection Systems

  • Concrete repairs

  • Application of protective coatings

Laura Coutts

I build kick-ass websites for small businesses, startups and not-for-profits.

https://www.hatchlabs.com.au
Previous
Previous

Barham River Bridge Works

Next
Next

Bluescope Wharf