Bluescope Wharf
In February 2016 MCM was awarded the Stage 1 contract for the remediation of the Bluescope Steel Wharf facility at Hastings, Victoria. Stages 2, 3 & 4 were subsequently awarded, and the project is ongoing.
Client brief
Stage 1 works included the repair and protection of heavily corroded concrete beams with gunite concrete repair, hybrid anode corrosion protection, finished with a silane protective coating. On the back of the Stage 1 works, MCM was awarded Stage 2 and subsequently Stage 3, then Stage 4, to extend the scope into 2020. Bluescope wharf is a fully operational wharf and good communication between MCM staff and Bluescope Steel has been a critical function of this contract.
What we delivered:
Stages 1, 2, 3 & 4
Design and installation of access
Concrete repair
Hybrid Anode installation
Protective coatings to steel
Silane application
Denso Seashield 2000FD to piles