Ryde Bridge

Transport

Client

DM Roads

Location

Ryde, New South Wales

Works Completed

Concrete repairs, Cathodic Protection, Protective coatings

At its peak, the project employed more than 30 site personnel, including electrical trades, access crews, formwork carpenters, and specialist technicians.

 

Constructed in 1935, Ryde Bridge replaced the original vehicular punt that operated as a main crossing over the Parramatta River between Ryde and Rhodes.

Client Brief

To undertake concrete repairs, protective coatings and installation of a cathodic protection system to the original concrete substructure, carried out across multiple piers simultaneously without affecting the waterway below or the road and footpaths above

What we delivered:

  • Access installation including circumferential scaffold towers and a full length underbridge walkway

  • Concrete repairs

  • Tie beam concrete encasements

  • Impressed Current Cathodic Protection System installation and commissioning

  • Underwater Galvanic Cathodic Protection installation
    and commissioning

  • Application of protective coatings

Laura Coutts

I build kick-ass websites for small businesses, startups and not-for-profits.

https://www.hatchlabs.com.au
Previous
Previous

Swanson Dock West

Next
Next

PTA Rail Bridge ICCP