Rose Bay Stormwater Rehabilitation
In October 2020, VBA JV awarded MCM the design and construct contract to repair and improve the stormwater network along New South Head Road, in Rose Bay, New South Wales.
Client brief
The existing stormwater outfall pipe became fully blocked by sand from storms in 2014–2016 and would cause flooding on New South Head Road, one of Sydney’s eastern suburbs’ main arterial roads.
What we delivered:
The project increased the drainage capacity in the area by:
replacing a 225mm ø pipe across the road with a 450mm ø pipe
increasing capacity of three surface inlets with SA2 gully pits
grinding out debris and relining the underground network to improve flow