Eastern Treatment Plant Tank Remediation
A critical asset for Melbourne Water, the Eastern Treatment Plant is located in Bangholme in Victoria and treats around 40% of Melbourne’s sewerage. A key part of the treatment process is 24 secondary sedimentation tanks which remove further solids from the effluent being treated. Due to the aggressive nature of effluent on these assets over their lifespan, major refurbishment is required to ensure they can continue to effectively operate.
Client Brief
Aqua Metro Services engaged MCM for the remediation of Tank 8 & 20. The scope of works included a broad range of repair methods to extend the service life of the tanks: concrete repairs, application of high build epoxy coating, blasting and painting of structural steel gantries and joint refurbishment.
What We Delivered:
Scaffold access and containment systems installation
Concrete patch repair
Crack Injection
Joint sealant replacement to the floor and wall joints
Blasting and painting of structural steel elements
Concrete surface preparation, re-profiling & application of a high-build epoxy coating