Pirrama Road Crib Wall Maintenance Works

Key details

Current status

Maintenance works are commencing soon

Location & Section

Pirrama Road, Pyrmont

Type of work

Stabilisation works

Start date

Monday, 20 November 2023

Duration

3 weeks – until 8 December 2023

Work hours

7.30am to 5.00pm Monday to Friday
7.30am to 3.30pm Saturday

Contact

Phillip Britten
Community Liaison Officer
0409 075 591
communityliaison@marineandcivil.com.au

 

Project overview

MCM will be stabilising the crib wall along Pirrama Road opposite the Pirrama Park Playground. As part of the stabilisation works, soil nails up to 6 metres in length will be installed through the concrete retaining wall at 1.5m centres in each direction. A galvanised steel mesh will then be laid and the wall sprayed with shotcrete to pin each element to the substrate.

These works will require temporary installation of a scaffold and A Class hoarding along the crib wall. The staircase leading from Herbert St to Pirrama Rd will be closed for the duration of works and reopened by 8 December 2023. All pedestrian access will be via the alternate route (see map below).

MCM will work to minimise community impacts during this time, however there will be minor machinery noise during the works.

The safety of everyone is our priority. Thank you for your patience while we complete these important works.

 